Workshop Facility

Workshop Facility located in 3rd Industrial Zone, Riyadh Construction Phases

Installation of steel structure

Installation of steel structure for new Riyadh Air Port (Terminal Link)

Heavy and Fine Maintenance Works Different Clients

Heavy and Fine Maintenance Works in Different Clients

Replacement of Furnace Discharge Tubes

Advanced Smelting Industries Co. Limited , Replacement of Furnace Discharge Tubes

Thermal Insulation Works

Thermal Insulation Works in Different Clients

King Khaled Airport Terminal Link 1 and 2 Expansion

King Khaled Airport Terminal Link 1 and 2 Expansion Project, Steel Structure Installation, Total Tonnage of 3,500 Tons.

Installation of Steel Structure for Skywalk Bridges

Installation of Steel Structure for Skywalk Bridges at KAFD Project, Total Tonnage of 1,300 Tons.

Southern Province Co. New Crusher Construction EP Filter

Southern Province Co. New Crusher Construction EP Filter Conversion Project with CTP, Total Tonnage of 1,300 Tons.

Southern Province Co. New Crusher Construction Civil Works

Southern Province Co. New Crusher Construction Civil Works With ThyssenKrupp, Total Concrete of 3,200 Mt³

Southern Province Co. New Crusher Construction

Southern Province Co. New Crusher Construction With ThyssenKrupp, Total Tonnage of 850 Tons.

Yanbu Cement Line #4 upgradation

Yanbu Cement via FLSmidth Line #4 upgradation Project, Total Tonnage of 900 Tons.

Clinker Cooler Upgradation

Clinker Cooler Upgradation to FLS Cross Bar and Linear Pendulum IKN, Total Tonnage of 1,300 Tons.

Construction of 2 Cement Mill Buildings

Construction of 2 Cement Mill Buildings with MCC5 and TKIS in New Yamama Cement, Total Tonnage of 10,000 Tons

DURRA Sugar Plant Material Handling System Construction

DURRA Sugar Plant Material Handling System Construction with TSK, Total Tonnage of 1600 Tons

DURRA Sugar Plant Electrical Construction

DURRA Sugar Plant Electrical Construction with TSK, Total 15 MW, 800,000 MT MV laid Power & Control cables, 25,000 Cable Trays, 1,500 Instrument

DURRA Sugar Plant Refinery Piping Construction

DURRA Sugar Plant Refinery Piping Construction with TSK, Total Dia/Inch of 136,000 Dia/inch.

Flouting Roof Tanks Installation

Flouting Roof Tanks Installation in Yamama Cement Plant with MCC5, 15,750 Mt³ Capacity

Arabian Cement Co. Line #6 & Line 5 Filter Upgrade

Arabian Cement Co. Line #6 & Line 5 Filter Upgrade Project, Total Tonnage of 4300 Tons

1st Zinc Plant in Middle East

1st Zinc Plant in Middle East Construction for Global Steel Dust Gulf Dammam Industrial City, Total Tonnage of 2300 Tons.

Saudi Cement Railway terminal Installation

Saudi Cement Railway terminal Installation With IBAU, Total Tonnage of 2100 Tons.

Al-RASHED Cement Grinding Plant Construction

Al-RASHED Cement Grinding Plant Construction, Total Tonnage of 2200 Tons.

CTP

Designed and installed 5,000+ tons of structural steel for an advanced cement manufacturing facility.